RTB stage

Ready to build solar projects in Italy for investors

RTB solar projects in Italy are authorised, grid-secured and ready for construction. Pipeline.Solar sends RTB, late-stage and turnkey opportunities as confidential teasers when the plant size fits your range.

Ready to build solar project in Italy with permits and grid connection documents

What makes an RTB solar project in Italy

An RTB project, or ready-to-build project, is one that can move to construction once financing and the EPC contract are in place. In Italy the RTB stage is normally defined by a set of documents rather than by a single certificate:

  • Permit granted: a PAS that has become effective or an Autorizzazione Unica (AU), under the regimes reorganised by Legislative Decree 190/2024, plus any environmental screening or VIA where required. See permitted projects.
  • Grid connection secured: an STMG issued by Terna or by the distributor and accepted by the producer under the TICA rules, with the connection solution and its cost defined.
  • Land rights: a registered surface right (DDS) or ownership of the land, consistent with the permitted layout.
  • Constraints checked: urban planning, landscape and environmental constraints addressed in the permit.
  • Design ready for EPC: a project mature enough to obtain construction offers.

For a full definition and checklist, read what RTB means in solar.

RTB, late-stage and turnkey: three ways in

Not every RTB solar opportunity looks the same, and the pipeline reflects that.

RTB projects

Authorised projects, usually transferred through the sale of the SPV or through an asset deal. You choose your EPC and manage construction.

Late-stage projects

Projects that are close to RTB but still miss something, for example a PAS filed but not yet approved, or land still under option. They are shared anyway, with the missing items clearly indicated, so you can price the residual risk. See late-stage solar projects.

Turnkey plants

You buy the plant built by an EPC, ready for connection or close to it. This option reduces construction effort on your side. See turnkey solar plants.

What an RTB teaser contains

Each project in the pipeline is recorded with the same standard fields, so you can compare RTB solar projects in Italy on a common basis:

FieldWhy it matters
PowerDrives the match with your MW range
STMG costWeight of the connection on total capex
Estimated days to connectionIndicates when revenues can start
Land under DDS or for sale, with costsDefines land structure and cash needs
Development costBasis for the price discussion
PAS filed / PAS approvedShows the real permit status

The teaser is anonymous. Location details, documents and counterparties are disclosed after the NDA.

Who sells RTB solar projects in Italy

RTB solar projects in Italy for sale come from different sources: independent developers who prefer to exit at the RTB stage, technical studios that developed projects for landowners, companies rebalancing their portfolio and EPC contractors that hold authorised projects. Each source has its own habits in how files are prepared. Pipeline.Solar brings them into the same format, runs a preliminary screening and sends you only what is consistent with your mandate. Opportunities depend on the projects available at the time, so the flow of RTB projects varies by region, size and technology.

Set the power you are looking for

Matching is based on the power of the single plant. In your reserved area you set a minimum and maximum in MW, and you receive a teaser only when an RTB project falls inside that range. If you look for a portfolio of RTB projects, set the range for each plant, not the total. You also choose regions, technologies (ground-mounted PV, agrivoltaic, BESS, hybrid) and structures (SPV share deal, asset deal).

Every teaser is checked and sent manually by our staff from deal@pipeline.solar. No automatic mailings and no newsletters. Set your MW range to start receiving RTB opportunities.

From RTB teaser to closing

When an RTB project interests you, you sign the NDA and, where foreseen, a scouting agreement. You access the data room, your advisors run the technical, legal and grid due diligence, and you negotiate directly with the project owner. Pipeline.Solar performs a preliminary screening of the data and coordinates access to documents; it does not perform the due diligence for you. The price of an RTB project depends on the connection cost and timing, land structure, permit quality, irradiation, expected capex and available contracts such as FER X; see solar project valuation.

Questions before registering? Write to us on WhatsApp.

Frequently asked questions

Do you only work with ready-to-build projects?

No. RTB is the stage most investors ask for, but the pipeline also covers greenfield co-development, late-stage projects, brownfield plants waiting for connection and plants in operation. You choose the stages in your search criteria.

Are RTB projects offered on an exclusive basis?

Exclusivity is not granted by default. It can be discussed case by case with the project owner, for a defined period and usually after the NDA and a first review of the data room.

Is it mandatory to use a specific EPC contractor?

In most RTB deals you are free to appoint your own EPC. Some projects are offered together with an EPC, or as turnkey plants, and this is stated in the teaser.

How long does it take to connect an RTB project?

It depends on the grid works required, the voltage level, the authorisation of the network works and the grid operator schedule. The teaser reports the estimated days to connection declared for each project.

Private, criteria-based deal flow

Tell us the plant size you are looking for. We send the teaser when a project fits.

Greenfield, RTB, brownfield or operating plants in Italy. Teasers only when the size fits; full documents under NDA.