How it works for solar investors in Italy: six steps

The solar investment process with Pipeline.Solar is short and predictable: you set your criteria once, and you receive a teaser only when a project in Italy matches them.

Six-step process for investors acquiring solar projects in Italy

The solar acquisition process at a glance

Buying solar projects in Italy usually means dealing with many counterparties, incomplete files and documents written for local authorities. The Pipeline.Solar process is designed to give you a single point of contact and a consistent format, from the first message to the negotiation with the project owner. It covers all four stages: greenfield, RTB, brownfield and COD.

Steps one and two: contact and introductory call

Step one: first contact

You reach us through WhatsApp or the investor access form. A few lines on who you are and what you look for are enough.

Step two: introductory call

We discuss your mandate: type of investor, stages of interest, plant size, regions, technologies, preferred structure and internal decision process. The call helps us understand which projects would be relevant and which would only waste your time.

Step three: reserved area and search criteria

After the call you receive a personal link to your reserved area. There you set:

  • Stages: greenfield, RTB, brownfield, COD.
  • Power of the single plant: minimum and maximum MW.
  • Regions.
  • Technologies: ground-mounted PV, agrivoltaic, BESS, hybrid.
  • Structures: SPV share deal, asset deal, co-development.

If you prefer, our staff enters the criteria for you after the call. You can update them whenever your mandate changes.

Step four: projects recorded with standard fields

When a project enters the pipeline, it is recorded with the same fields used for every other project. These are the fields you find in each teaser:

FieldWhat it tells you
PowerSize of the single plant, used for matching
STMG costCost of the connection solution offered by the grid operator
Estimated days to connectionTime declared until the plant can be connected
Land: DDS or for sale, with costsWhether the land is under surface right or sold, and at what cost
Development costCost of the development work requested
PAS filedWhether the permit application has been submitted
PAS approvedWhether the permit has been obtained

For connection details see STMG and TICA explained; for permits see PAS and AU.

Step five: the teaser, sent by our staff

If the power of the single plant falls inside your range, the project becomes a candidate for you. Our staff checks the match and the data, then sends the teaser with one click from deal@pipeline.solar, with a personal link. Nothing is sent automatically, and there is no newsletter. The teaser is anonymous: it shows the standard data without revealing location or counterparties.

Step six: NDA, data room and negotiation

If you are interested, you sign the NDA and, where foreseen, a scouting agreement. You then access the data room. Your technical, legal and financial advisors carry out the due diligence, which is your responsibility; Pipeline.Solar has already performed a preliminary screening and coordinates access to documents. The negotiation takes place directly with the project owner. See the solar data room checklist for the documents you can expect.

Every teaser is checked and sent manually by the staff. Start with step one.

What Pipeline.Solar does, and what it leaves to you

Throughout the process, roles stay clear. Pipeline.Solar collects projects from its network, records them in a common format, screens the data, sends teasers to compatible investors and coordinates the NDA and access to documents. It does not publish projects, does not make offers to the public, does not provide financial advice and does not carry out the due diligence on your behalf.

You decide which teasers to pursue, appoint your advisors, assess the risks and agree terms with the owner. Opportunities depend on the projects available at the time, so the process does not promise a given number of projects, a region or a response time. What it does provide is a consistent way to read every opportunity you receive.

Frequently asked questions

Do I need to sign an NDA to see projects?

You receive the anonymous teaser without an NDA. To learn the location, the counterparties and to access the data room, an NDA is required.

What does a teaser contain?

A teaser is a short anonymous summary: stage, power of the single plant, region, technology, STMG status and connection cost, land arrangement (surface right or purchase), PAS or AU status and the structure proposed. Location and counterparties are shared only after the NDA.

Can I receive both RTB and greenfield projects?

Yes. Select both stages in your reserved area. Each teaser states the stage of the project.

What if my criteria change?

Update them in your reserved area or tell our staff on WhatsApp. Future teasers will follow the new criteria.

Private, criteria-based deal flow

Tell us the plant size you are looking for. We send the teaser when a project fits.

Greenfield, RTB, brownfield or operating plants in Italy. Teasers only when the size fits; full documents under NDA.